Translations:Chybové hlášky/13/en
The loading date must be scheduled after the date specified in the "Available from" field, but also before the dates specified in the "Earliest arrival," "Closing date," and "ETS" fields to ensure a smooth logistical process.
It is not possible to select METRANS as the shipping line for the chosen terminal.