Translations:Chybové hlášky/11/en: Porovnání verzí
(založena nová stránka s textem „The ETS date must either coincide with the closing date or occur later to ensure enough time for all necessary steps before the process is finalized. <p> '''The container has already been scheduled for transport by METRANS.''' <br>“) |
(Žádný rozdíl)
|
Aktuální verze z 12. 9. 2024, 09:11
The ETS date must either coincide with the closing date or occur later to ensure enough time for all necessary steps before the process is finalized.
The container has already been scheduled for transport by METRANS.